Co Design&Build
|
OpenBox and BEG Ingénierie have delivered the 4th logistical platform of Dutch group ACTION close to Angers (49). Respecting the demanding and precise specifications, OpenBox was responsible for the technical and financial proposal, performance studies and selection of contractors which it coordinated for performance of the works, with a particular focus on issues of environmental compliance.
The platform’s construction site covered some 70,000 m² and began in Autumn 2019: in total a year of studies and works were necessary for the construction of 8 traditional storage units, 2 hazardous product storage units and a packaging unit. Offices and technical premises were also built to round off the project. The roofing was designed so as to integrate a photovoltaic system. The building will receive the BREEAM Very Good rating. Given the size of the operation, and to further consolidate the OpenBox commitment, the Real-Estate Development Contract was signed between BEG Ingénierie, shareholder of OpenBox and ACTION. Comments are closed.
|
Catégories
All
Archives
January 2024
|